Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
久久夜色精品国产噜噜亚洲av | 成人免费无遮挡无码黄漫视频| 欧美熟妇另类久久久久久不卡| 丁香五月色情久久久久| 特发性震颤是什么病| 精品无码国产一区二区三区51安| 云浮市人力资源和社会保障局 | 亚洲精品粉嫩小泬18P| 久久久久人妻精品一区三寸蜜桃| 国产免费一区二区在线a片视频 | 欧美激情在线视频| 与80岁老太做爰A片免费看| 男人添女人囗交做爰视频| 40厘米黑人与中国女人| ASS少妇PICS粉嫩BBW| A片在线播放| 成熟丰满熟妇高潮XXXXX视频| 欧美熟妇VIVOE精品| 大内密探零零性性| 迎合疯狂肉伦耕耘播种| 18禁高潮出水呻吟娇喘MP3| 无码欧美毛片一区二区三| 性xxxx欧美孕妇奶水| 少妇把腿扒开让我添69式| 欧美人妻精品一区二区三区 | 丰满大爆乳波霸奶| 女人扒开屁股桶爽30分钟高潮| 伊人色啪啪天天综合婷婷| 在线 | 一区二区三区| 最近免费中文字幕mv免费高清版| 国产裸体美女永久免费无遮挡 | 仙踪林国精产品视频| 好涨嗯太深了嗯啊用力别停| 97精品超碰一区二区三区| 女女车车的车车视频免费| 一女被多男玩喷潮视频免费看| 国产成人AAAAA级毛片| 三上悠亚上司の在线播放| 日韩久久无码免费毛片软件| 亚洲熟妇AV日韩熟妇在线 | 国产精品一区二区av|